Developing a 2013 Workflow on SharePoint 2013 using Visual Studio 2012, deploying workflow changes does not update the workflow that runs. This has already been posted on the SP 2013 dev forum, but I wanted to check here with the workflow folks. Anyone run into this issue before and/or have tips for solving?
Thanks.
http://social.msdn.microsoft.com/Forums/en-US/sharepointdevelopment/thread/cd543a00-f3ab-4a4a-8682-b81d8330b677